发动机试验铁地板铸铁平台 空气弹簧隔振系统

  • 发布时间:2020-04-30 08:39:47,加入时间:2019年09月06日(距今1717天)
  • 地址:中国»河北»沧州:河北省泊头市交河镇西武港路北
  • 公司:沧州华威机械制造有限公司, 用户等级:普通会员 已认证
  • 联系:吴燕,手机:15100844995 微信:sxj4995 电话:0317-8184305 QQ:2043638948
  • 报价:3600/件

一、内容概述Overview   试验铁地板Base Plate   附件Accessories:空气弹簧隔振系统Air springs vibration isolation system.   二、技术资料Technical information:   铸件标准Castin standard JB/T7974-1999;   时效处理Aging treatment GB/T9439-2010;   T型槽执行标准T-slot standard JB/T158-1996;   未注线性公差标准Un

eaner tolerance standard GB/T1804-2000;   铸件鉴定Casting identification GB4986-85;   三、技术要求及有关说明Technical requirements and attentions:   T型槽尺寸DIN28,间距为250mm均匀分布;   T-slot standard according to DIN28,distance between T-slots is 250 mm;   铸铁平板精度等级为三级(整体外观质量),材料为:HT250,时效处理HT250执行GB/T9439- 2010标准;   Casting iron plate accuracy is Grade 3,material is HT250, Aging treatment for HT250 according to standard GB/T9439-2010   铸件表面不得有裂纹、砂眼、气孔、缩松等铸造缺陷以及毛刺、浇帽口和氧化皮等工艺缺陷, 不得有影响铸件使用性能的冷隔、加渣、穿透性气孔等缺陷;   Following defects are not acceptable :casting defects such as crack,sand hole,air blister,shrinkage,etc;technology defects such as burr,casting head,scale,etc;defects which affect the normal use such as cold shut,production of dross,penetrating pore,etc.   平台的制造分铸造、粗加工、精加工三大阶段,整个过程进行两次回火处理,第一次在铸件毛 坯形成后,第二次在粗加工完毕后。铸造后进行充分时效处理,消除内应力,技术斜度2°30′;   There are three steps which are casting,rough machining,finish machining for making clamping plate.Two times tempering should be done in the whole manufacturing process,the first time is after rough casting,the second time is after rough machining.Enough   aging treatment and relieving of internal stress should be done after casting,technical slope 2°30′.   铁地板工作平面的平面度(单位,对角线):≤0.25mm,工作平面的粗糙度为3.2μm,底部安 装空气弹簧平面粗糙为<6.3μm,T型槽的平行度公差≤0.3mm;   Flatness of working surface(unit,catercorner): ≤0.25mm   Roughness of working surface: 3.2μm   Roughness of surface for air spring installation: <6.3μm   T-slot parallelism tolerance: <6.3μm   除上述要求外,铸件按标准   JB/T7974-1999铸造平板生产,国标GB4986-85进行鉴定;尺寸和公差按双方的图纸要求。如上 述标准被替代按相应标准进行,未注线性公差按   GB/T1804-2000按m级规定执行;   In addition to above requirements,the casting manufacturing is according to standard JB/T7974-1999,authentication is according to national standard GB4986- 85,dimension and tolerance is according to the requirements in the drawings.Refer the relevant standard if any of above standards is replaced, u leaner tolerance is according to GB/T1804-2000,grade m.   平板非工作面涂防锈底漆,面漆为蓝色,工作表面涂防锈油;   Plate non-working surface should be coated by rust inhibiting primer,finishing coat in blue,working surface should be coated by rust preventive oil.   平台安装采用弹簧阻尼隔震系统;   The clamping plate is installed on air springs vibration isolation system.   铁地板的整体结构必须满足设备250KN的静态载荷和180kN的动态载荷的要求。

联系我时请说明来自志趣网,谢谢!

免责申明:志趣网所展示的信息由用户自行提供,其真实性、合法性、准确性由信息发布人负责。使用本网站的所有用户须接受并遵守法律法规。志趣网不提供任何保证,并不承担任何法律责任。 志趣网建议您交易小心谨慎。